Dismantle, quickly and economically two storey modular school consisting of 2 no. two storey units consisting of Construction Studies room, Art Room, 2 Classrooms and WC units from site in Galway, bring to factory to modify to meet requirements of ERIU Secondary School. Strip out furniture and rearrange partitions and other internal finishes to meet new requirements – carrying this out in the factory saved valuable time while site works were being carried out. Prepare site in ERIU – greenfield site adjacent to existing school in very busy and built-up area. Site levelling, services connections, foundation pads, drainage, roadways, car parking, steel stairs with covered canopy and line marking.